Unable to Launch Flash Player
This message is being displayed because the browser was unable to load the Flash Player required to display this content.
There are several possible causes for this;
- Your current Flash Player is outdated or it is not installed on your system. Download the latest Flash Player.
- Your browser does not have JavaScript enabled, this is required to load the Flash content.
- The Theme file used to generate this site may be missing the required JavaScript to launch the Flash player.
HIGHLIGHTS
- Working on a tight timeline, Morinwood, Inc. set up a
dedicated 5,000 square foot manufacturing facility where
one million individual parts were assembled.
- Convinced that higher quality and speed were possible
by machine than by hand, Morinwood built a robotic
assembly line. The resulting process uses a German built
Kuka robotic arm, adapted into a specialized assembly
cell — a first for the BC woodworking industry.
- The project was completed on time and on budget, drawing government and media attention to the advanced methods used.